SELECTED
WORK
200+ projects shipped. Here are six that show what happens when senior engineers build without compromise.
GrowthLoop
Analytics dashboard MVP that helped close a $1.2M seed round
Challenge
GrowthLoop had a solid backend but nothing to show investors. Their seed round was closing in 4 weeks and they needed a demo that looked like a product, not a prototype.
Solution
We built a responsive Next.js dashboard with real-time charts, user management, and Stripe billing. Deployed to Vercel with CI/CD. Looked like they’d been building for a year.
Results
- 01MVP live in 3 weeks
- 02Helped close $1.2M seed round
- 03200+ beta users in first month
- 04Still running with zero downtime
CareBridge
Replaced paper forms with a digital intake system in 4 weeks
Challenge
A healthcare clinic drowning in paper. Staff spent more time on data entry than patient care. Their existing “solution” was a shared Google Drive folder. Seriously.
Solution
Built a patient intake portal with digital forms, document upload, and EHR integration. Mobile-friendly for patients, streamlined for staff. HIPAA-conscious from the start.
Results
- 0160% less admin time
- 02Patient satisfaction up 40%
- 03Delivered in 4 weeks
- 043 EHR integrations shipped
PriceWise
AI product descriptions for 10K SKUs (35% traffic boost)
Challenge
10,000 products with garbage descriptions. Writing them manually would take months and cost a fortune. SEO was suffering and so was conversion.
Solution
Built an LLM pipeline that generates unique, SEO-optimized descriptions from product data. Added a review interface so their team could approve in batches instead of writing from scratch.
Results
- 0110K descriptions in 2 days
- 0235% organic traffic increase
- 03Delivered in 3 weeks
- 04Now auto-generates for new products
FieldWork
Scheduling app that eliminated 80% of job conflicts
Challenge
50 contractors managed via spreadsheets and group texts. Jobs fell through the cracks weekly. The operations manager was developing an eye twitch.
Solution
Built a scheduling app with drag-and-drop calendars, push notifications, GPS check-ins, and automatic conflict detection. Mobile-first because nobody on a job site uses a laptop.
Results
- 0180% fewer scheduling conflicts
- 022 hrs/week saved per PM
- 03Delivered in 5 weeks
- 04Full team adoption in week one
YOUR PROJECT
NEXT?
Let's add your name to this list.
START A PROJECT →